Project introduction: 20 chemical foil production lines were built in the first phase of the project, and 18 new production lines were added in the second phase. At present, both phases of the project have been successfully completed, passed the completion environmental protection acceptance, and officially put into production. The actual annual output of medium and high voltage chemical foils in the two phases of the project can reach 15.2 million square meters, laying a solid production capacity foundation for the company in the chemical foil market.
During the construction of the first and second phases of the project, the company strictly planned and laid out in accordance with the standards of modern industrial production, fully considering the rationality of the production process, the advancement of equipment and environmental protection requirements. The production workshop adopts a standardized design and is equipped with complete environmental protection facilities such as ventilation, dust removal, and wastewater treatment to ensure that the production process meets national environmental protection standards.